Insulation Seamless Crane Power Busbar

No seam slip contact and no middle joint is a kind of slide contact without power off. With oxygen free copper (99.99% conductivity) transmission power supply, copper conductor thickness (general standard thickness is2.8m/mx10W), low pressure drop, better conductivity; A safety rail of the same...

Send Inquiry

No seam slip contact and no middle joint is a kind of slide contact without power off. With oxygen free copper (99.99% conductivity) transmission power supply, copper conductor thickness (general standard thickness is2.8m/mx10W), low pressure drop, better conductivity; A safety rail of the same length can be equipped according to the length of the workshop or the needs of the users, so that there is no interface in the safe distribution of the whole workshop, which truly solves the problem of short circuit or failure in operation caused by the fact that the interface of the domestic sliding wire often gets stuck with the brush. And suitable for curve, arc and high and low walking design.

No seam slip contact features:

(1) the conductor is oxygen-free copper, containing 99.9% of tuner and over 100% conductivity. Made of special materials.

(2) there is no connection in one line, the pressure drop is small, the failure rate is greatly reduced, and the normal operation of the equipment is guaranteed.

(3) plate into a round, easy to transport.

Insulation seamless crane power busbar

Slip line installation matters needing attention

1) the parallel error between the slide line and the horizontal and vertical directions of the mobile device shall not be greater than 1.5/1000;

2) the joints shall not be loose

3) installation of collector must ensure that the contact pressure of each carbon brush conforms to the standard;

4) after power-on no-load trial operation for 30min, run with load for at least 10min to check the situation of each part.